Self-leveling underlayment poured over a subfloor before tile (illustration)

Massachusetts, Rhode Island and New Hampshire

Floor Leveling & Preparation

Subfloor repair, flattening and underlayment so tile, stone and LVP go down on a surface that will not crack them.

  • Owner-run: you deal with Malvino
  • Waterproofing and prep spelled out in writing
  • Residential and commercial

Get an estimateCall (508) 239-2004

Estimate request

Get your estimate

Tell us about the project and Malvino will get back to you.

Enter your name.

Enter a 10-digit phone number.

Enter an email like you@example.com.

Enter the town the project is in.

Choose the type of project.

Prefer to talk? (508) 239-2004

How we handle floor leveling & prep

Every flooring failure we are called to look at started with the surface underneath. Tile cracks over floors that flex. Grout pops over subfloor seams. Plank floors separate over dips. Preparation is the part of the job that prevents all of it.

We start by checking stiffness: joist size and span, subfloor thickness and any soft spots from old leaks. Then we fix what needs fixing, with blocking, new plywood or screws on a tight pattern, and flatten the surface with self-leveling underlayment or patching compound.

The last layer depends on what is going down: cement board, an uncoupling membrane, a crack-isolation membrane over a slab, or a smooth skim coat for LVP. We do this prep for our own installations and for builders and flooring installers who want the floor ready.

Request an estimate

What this covers

  • Subfloor repair and replacement
  • Added plywood and blocking for stiffness
  • Self-leveling underlayment
  • Patching and skim coating
  • Cement board and membranes
  • Slab crack isolation and moisture checks

Process

How a job with us runs

  1. 01

    Look at the space

    We measure, check what the work is going onto (subfloor, joists, wallboard, slab) and talk through the materials you have in mind.

  2. 02

    Written estimate

    You get a written price that spells out demolition, prep, waterproofing, materials and layout, so you can compare it line by line.

  3. 03

    Prep and waterproof

    Most failures start under the finish. We flatten and stiffen the surface, and in wet areas we waterproof before a single tile goes up.

  4. 04

    Install and finish

    Layout is planned so cuts land where they look intentional. We set, grout, seal where the material needs it, and clean up.

Floor Leveling & Prep: common questions

What is the difference between level and flat?

Level means parallel to the horizon. Flat means a consistent plane with no humps or dips. Tile and plank floors need flat. A floor can slope gently and still be fine as long as it is flat.

How flat does a floor need to be for tile?

For tile with any side 15 inches or longer, within an eighth of an inch over ten feet. Smaller tile allows a quarter inch over ten feet.

Can you level a floor in an old house?

Usually we can flatten it, which is what the flooring needs. Making an old, sloped floor truly level can mean structural work below. We tell you which you need.

How do I get an estimate?

Call (508) 239-2004, email matileinc@gmail.com or send the form on this page. We set up a time to see the space, then send a written estimate.

What areas do you serve?

MA Tile Inc is based at 55 Lawrence St in Milford, MA. Most of our work is in Central and MetroWest Massachusetts, and we also take projects in northern Rhode Island and southern New Hampshire.

Call (508) 239-2004Get an estimate