Kitchen remodel in progress with white shaker cabinets and new stone countertops installed

Massachusetts, Rhode Island and New Hampshire

Kitchen Cabinet Installation

Base, wall and tall cabinets set level, plumb and square, so doors line up and countertops sit flat.

  • Owner-run: you deal with Malvino
  • Waterproofing and prep spelled out in writing
  • Residential and commercial

Get an estimateCall (508) 239-2004

Estimate request

Get your estimate

Tell us about the project and Malvino will get back to you.

Enter your name.

Enter a 10-digit phone number.

Enter an email like you@example.com.

Enter the town the project is in.

Choose the type of project.

Prefer to talk? (508) 239-2004

How we handle kitchen cabinets

Cabinets decide how the whole kitchen finishes. If the boxes are out of level by even an eighth of an inch across a run, the countertop will not sit flat, doors will not line up, and the backsplash line will wander.

We find the high point of the floor, set a level line around the room, shim and fasten base cabinets to it, hang wall cabinets on a ledger, and scribe fillers and end panels to walls that are not straight. Crown, light rail, toe kick and hardware finish the job.

We install cabinets you buy from a showroom, home center or online supplier, and can check the order against the room before it ships.

Request an estimate

What this covers

  • Base, wall, tall and island cabinets
  • Leveling over uneven floors
  • Fillers and panels scribed to walls
  • Crown molding, light rail and toe kick
  • Door and drawer adjustment
  • Hardware installation

Our work

Kitchen Cabinets by MA Tile Inc

  • Kitchen remodel in progress with white shaker cabinets and new stone countertops installed
    Kitchen remodel in progress: cabinets and countertops in
  • Kitchen with white veined countertops, a slab backsplash and an undermount sink below a window
    Veined countertops with a matching slab backsplash

See all photos and videos

Process

How a job with us runs

  1. 01

    Look at the space

    We measure, check what the work is going onto (subfloor, joists, wallboard, slab) and talk through the materials you have in mind.

  2. 02

    Written estimate

    You get a written price that spells out demolition, prep, waterproofing, materials and layout, so you can compare it line by line.

  3. 03

    Prep and waterproof

    Most failures start under the finish. We flatten and stiffen the surface, and in wet areas we waterproof before a single tile goes up.

  4. 04

    Install and finish

    Layout is planned so cuts land where they look intentional. We set, grout, seal where the material needs it, and clean up.

Kitchen Cabinets: common questions

Do you install cabinets I buy myself?

Yes. Send us the cabinet layout or order sheet and we will price the installation.

Should flooring go in before the cabinets?

Tile usually goes in first so the floor runs under the appliances and the toe kick. Floating floors such as LVP go in after the cabinets, because they should not be pinned under that weight.

How long does cabinet installation take?

An average kitchen takes two to four days, plus trim. Countertops are templated once the cabinets are set.

How do I get an estimate?

Call (508) 239-2004, email matileinc@gmail.com or send the form on this page. We set up a time to see the space, then send a written estimate.

What areas do you serve?

MA Tile Inc is based at 55 Lawrence St in Milford, MA. Most of our work is in Central and MetroWest Massachusetts, and we also take projects in northern Rhode Island and southern New Hampshire.

Call (508) 239-2004Get an estimate