Massachusetts, Rhode Island and New Hampshire
Kitchen Cabinet Installation
Base, wall and tall cabinets set level, plumb and square, so doors line up and countertops sit flat.
- Owner-run: you deal with Malvino
- Waterproofing and prep spelled out in writing
- Residential and commercial
How we handle kitchen cabinets
Cabinets decide how the whole kitchen finishes. If the boxes are out of level by even an eighth of an inch across a run, the countertop will not sit flat, doors will not line up, and the backsplash line will wander.
We find the high point of the floor, set a level line around the room, shim and fasten base cabinets to it, hang wall cabinets on a ledger, and scribe fillers and end panels to walls that are not straight. Crown, light rail, toe kick and hardware finish the job.
We install cabinets you buy from a showroom, home center or online supplier, and can check the order against the room before it ships.
What this covers
- Base, wall, tall and island cabinets
- Leveling over uneven floors
- Fillers and panels scribed to walls
- Crown molding, light rail and toe kick
- Door and drawer adjustment
- Hardware installation
Process
How a job with us runs
- 01
Look at the space
We measure, check what the work is going onto (subfloor, joists, wallboard, slab) and talk through the materials you have in mind.
- 02
Written estimate
You get a written price that spells out demolition, prep, waterproofing, materials and layout, so you can compare it line by line.
- 03
Prep and waterproof
Most failures start under the finish. We flatten and stiffen the surface, and in wet areas we waterproof before a single tile goes up.
- 04
Install and finish
Layout is planned so cuts land where they look intentional. We set, grout, seal where the material needs it, and clean up.
Kitchen Cabinets: common questions
Do you install cabinets I buy myself?
Yes. Send us the cabinet layout or order sheet and we will price the installation.
Should flooring go in before the cabinets?
Tile usually goes in first so the floor runs under the appliances and the toe kick. Floating floors such as LVP go in after the cabinets, because they should not be pinned under that weight.
How long does cabinet installation take?
An average kitchen takes two to four days, plus trim. Countertops are templated once the cabinets are set.
How do I get an estimate?
Call (508) 239-2004, email matileinc@gmail.com or send the form on this page. We set up a time to see the space, then send a written estimate.
What areas do you serve?
MA Tile Inc is based at 55 Lawrence St in Milford, MA. Most of our work is in Central and MetroWest Massachusetts, and we also take projects in northern Rhode Island and southern New Hampshire.
Kitchen Cabinets near you
- Milford, MA
- Hopedale, MA
- Mendon, MA
- Upton, MA
- Hopkinton, MA
- Holliston, MA
- Medway, MA
- Bellingham, MA
- Franklin, MA
- Northbridge, MA
- Uxbridge, MA
- Grafton, MA
- Westborough, MA
- Southborough, MA
- Ashland, MA
- Framingham, MA
- Natick, MA
- Sherborn, MA
- Millis, MA
- Medfield, MA
- Norfolk, MA
- Wrentham, MA
- Blackstone, MA
- Millville, MA
- Douglas, MA
- Sutton, MA
- Shrewsbury, MA
- Marlborough, MA
- Wellesley, MA
- Needham, MA
- Walpole, MA
- Foxborough, MA
- Worcester, MA
- Woonsocket, RI
- Cumberland, RI
- North Smithfield, RI
- Lincoln, RI
Related services

Complete Kitchen Remodeling
Kitchen remodels from demolition to backsplash: cabinets, countertops, flooring and tile handled by one contractor.
Details
Granite, Quartz & Marble Countertop Installation
Granite, quartz and marble countertops with matching slab backsplashes, templated to your cabinets and installed with tight seams.
Details
Kitchen Backsplash Installation
Tile and full-height slab backsplashes, laid out so the cuts, outlets and edges look planned.
Details

