Corner shower in geometric hexagon tile with an angled curb, set on a large-format gray porcelain bathroom floor

Serving Douglas, MA

Tile Installation in Douglas, MA

Custom showers, tile, countertops, and bathroom and kitchen remodeling for Douglas homes and businesses, from a contractor based in nearby Milford.

  • Owner-run: you deal with Malvino
  • Waterproofing and prep spelled out in writing
  • Residential and commercial

Get an estimateCall (508) 239-2004

Estimate request

Get an estimate in Douglas

Tell us about the project and Malvino will get back to you.

Enter your name.

Enter a 10-digit phone number.

Enter an email like you@example.com.

Enter the town the project is in.

Choose the type of project.

Prefer to talk? (508) 239-2004

Tile work in Douglas

Douglas is a rural town on the edge of Douglas State Forest, with an old village center and lake homes around its ponds and reservoirs.

Lake and seasonal homes

Homes near the water are often former camps that were converted to year-round use, with shallow crawl spaces and floors that move with the seasons. Uncoupling membranes and heated floors both earn their keep in these houses.

Most requested in Douglas: tile installation and heated tile flooring installation.

Request an estimate

What to expect

  • Malvino comes out to see the space in Douglas
  • Written estimate listing prep, waterproofing and materials
  • Floors and walls corrected before tile is set
  • Showers waterproofed and flood tested
  • Clean job site at the end of each day

Services in Douglas, MA

What we do in Douglas

Our work

Recent MA Tile Inc projects

  • Corner shower in geometric hexagon tile with an angled curb, set on a large-format gray porcelain bathroom floor
    Geometric tile shower with an angled curb on a gray porcelain floor
  • Kitchen with white veined countertops, a slab backsplash and an undermount sink below a window
    Veined countertops with a matching slab backsplash
  • Walk-in shower with marble-look porcelain walls, a wood-look accent wall, gold edge trim, a niche, a bench and a herringbone floor with a linear drain
    Marble-look shower with a wood-look accent wall, gold trim, bench, niche and herringbone floor

See all photos and videos

Process

How a job in Douglas runs

  1. 01

    Look at the space

    We measure, check what the work is going onto (subfloor, joists, wallboard, slab) and talk through the materials you have in mind.

  2. 02

    Written estimate

    You get a written price that spells out demolition, prep, waterproofing, materials and layout, so you can compare it line by line.

  3. 03

    Prep and waterproof

    Most failures start under the finish. We flatten and stiffen the surface, and in wet areas we waterproof before a single tile goes up.

  4. 04

    Install and finish

    Layout is planned so cuts land where they look intentional. We set, grout, seal where the material needs it, and clean up.

Douglas homeowners ask

Do you install tile in Douglas, MA?

Yes. MA Tile Inc is based in Milford, MA and works in Douglas regularly. We install tile, custom showers, countertops and backsplashes, and take on full bathroom and kitchen remodels.

Do I need a permit for a bathroom remodel in Douglas?

Replacing tile alone generally does not need a permit. Moving plumbing, changing wiring or altering framing does, and those permits are pulled by the licensed trades through the Douglas building department. We tell you at the estimate what your project is likely to need.

How do I get an estimate?

Call (508) 239-2004, email matileinc@gmail.com or send the form on this page. We set up a time to see the space, then send a written estimate.

Can I buy my own tile?

Yes. Many customers pick their tile at a showroom or supplier and have us install it. Send us the spec sheet before you order: size, thickness and material change what the surface underneath needs, and we can tell you how much to buy including waste.

How long does a tile job take?

A backsplash is usually one to two days. A tile floor in one room is typically two to four days including prep and grout. A full custom shower runs about one to two weeks because waterproofing and mortar need cure time between steps.

Call (508) 239-2004Get an estimate