How we handle kitchen remodeling
A kitchen remodel is a sequence, and most delays come from trades waiting on each other. We run the sequence as one job: demolition, floor prep, flooring, cabinet installation, countertop template and install, backsplash, and final details.
Plumbing, gas and electrical work are done by licensed trades and scheduled into that sequence, so the sink, range and outlets land where the cabinets and counters need them.
Keeping the same layout is the fastest and least expensive route. If you want to move the sink, open a wall or add an island, we plan that first because it drives everything after it.
What this covers
- Demolition and disposal
- Floor leveling and new flooring
- Cabinet installation
- Countertop template and installation
- Backsplash tile or slab
- Coordination with plumber and electrician
Process
How a job with us runs
- 01
Look at the space
We measure, check what the work is going onto (subfloor, joists, wallboard, slab) and talk through the materials you have in mind.
- 02
Written estimate
You get a written price that spells out demolition, prep, waterproofing, materials and layout, so you can compare it line by line.
- 03
Prep and waterproof
Most failures start under the finish. We flatten and stiffen the surface, and in wet areas we waterproof before a single tile goes up.
- 04
Install and finish
Layout is planned so cuts land where they look intentional. We set, grout, seal where the material needs it, and clean up.
Kitchen Remodeling: common questions
How long does a kitchen remodel take?
A same-layout remodel typically runs four to eight weeks once materials are on hand. Countertops add a gap between template and install because the stone is cut after the cabinets are set.
Can I keep my cabinets and replace only the counters and backsplash?
Yes, if the cabinets are solid and level. That is a common and much shorter project.
Do I need a permit?
Replacing cabinets, counters and tile in place generally does not need one. Moving plumbing, gas, wiring or walls does, and those permits are pulled by the licensed trades.
How do I get an estimate?
Call (508) 239-2004, email matileinc@gmail.com or send the form on this page. We set up a time to see the space, then send a written estimate.
What areas do you serve?
MA Tile Inc is based at 55 Lawrence St in Milford, MA. Most of our work is in Central and MetroWest Massachusetts, and we also take projects in northern Rhode Island and southern New Hampshire.
Kitchen Remodeling near you
- Milford, MA
- Hopedale, MA
- Mendon, MA
- Upton, MA
- Hopkinton, MA
- Holliston, MA
- Medway, MA
- Bellingham, MA
- Franklin, MA
- Northbridge, MA
- Uxbridge, MA
- Grafton, MA
- Westborough, MA
- Southborough, MA
- Ashland, MA
- Framingham, MA
- Natick, MA
- Sherborn, MA
- Millis, MA
- Medfield, MA
- Norfolk, MA
- Wrentham, MA
- Blackstone, MA
- Millville, MA
- Douglas, MA
- Sutton, MA
- Shrewsbury, MA
- Marlborough, MA
- Wellesley, MA
- Needham, MA
- Walpole, MA
- Foxborough, MA
- Worcester, MA
- Woonsocket, RI
- Cumberland, RI
- North Smithfield, RI
- Lincoln, RI
Related services

Kitchen Cabinet Installation
Base, wall and tall cabinets set level, plumb and square, so doors line up and countertops sit flat.
Details
Granite, Quartz & Marble Countertop Installation
Granite, quartz and marble countertops with matching slab backsplashes, templated to your cabinets and installed with tight seams.
Details
Kitchen Backsplash Installation
Tile and full-height slab backsplashes, laid out so the cuts, outlets and edges look planned.
Details